3.3 Typical Retrot for
Roof Installation
1. Measure working area where
Reective Air will be applied.
2. Fasten the Reective Air to the
bottom of the rafter facing using 1/2”
staples every 4” - 6”.
3. Ensure that all seams are securely
taped using reective tape.
4. Leave approximately 2” free of
material at the eaves and sot/ridge
vent to ensure that good ventilation is maintained
3.4 Typical Ceiling Application
1. Measure working area where
Reective Air will be applied.
2. Fasten the Reective Air to the bottom
of the joist facing using 1/2” staples
every 4” - 6”.
3. The white polyethylene side of the
Reective Air should be facing the
mass insulation.
4. Ensure that all seams are securely
taped using reective tape.
5. Apply 1 x 3 strapping running horizontally (at 16” on centre) to the Reective Air, running the
length of the ceiling.
6. Fasten the interior nish to the strapping using approved construction methods.
MASS INSULATION
ROOF SHEATING
AND FINISH
Reflective Air
LEAVE OPEN
CEILING INTERIOR
FINISH
TRUSS OR RAFTERS
EXISTING ROOF
TRUSS OR RAFTERS
STRAPPING 1” x 3” AT
16” O.C.
AIR SPACE
CEILING FINISH
MASS INSULATION
OOD FRA
Reflective Air
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 16 17

Comments to this Manuals

No comments